Product Details
Automatic flat face mask machine with ear belt
Technical specification of equipment
Equipment process flow
The production line of high speed automatic flat face mask machine(One drag one)is developed by Qin-Tech company, which is also called the production line of Automatic high speed flat ear belt mask. Including automatic raw material delivery, automatic transmission, cutting off the bridge of the nose strip, mask edge welding, folding, ultrasonic fusion, molding, cutting off, transmission, ear belt welding, automatic discharge and other full process automation, complete the entire production process from the raw material coil to the finished mask.
Equipment Schematic Diagram
One drag one flat face mask machine details
Feeders
Folding
Nose bar
Ultrasonic welding
Ear belt welding
Finished Mask
Features of equipment
1. Automatic tension control of raw materials. Ensure material tension balance.
2. Photoelectric testing raw materials, avoiding mistakes and reduce waste.
3. It can produce three-layer mask body, and the upper length of the conveyor belt of the finished product is 1200MM.
4. The device has the function of total count and batch count. The number of batch count can be set randomly.
5. the whole machine adopts sheet metal + aluminum alloy structure, beautiful and strong without rust.
6. modular, user-friendly design for easy maintenance.
Equipment operation requirements
1.It can realize the operation mode of manual, automatic and single-action operation switching each other. The alarm should be displayed in the man-machine interface.
2. Adopt industrial computer to realize real-time communication with PLC, realize man-machine dialogue through touch screen, each setting operation needs to be simple and convenient;
3. The equipment complies with the national safety standards for electromechanical equipment;
Other requirements
The acceptance standard of the equipment: one week before the completion of the equipment assembly and debugging, the supplier shall notify the buyer to prepare the production materials, carry out the acceptance according to the technical requirements, and the buyer shall deliver the products by itself.
2.The acceptance of the equipment shall be attended by technicians designated by both parties and the acceptance report shall be signed.
Installation, debugging and training
The supplier's technicians are responsible for the remote guidance of the buyer's personnel for installation and debugging; The commissioning materials shall be provided by the buyer.
Quality assurance and after-sales service
1. The warranty period of the equipment is half a year (except damages caused by abnormal use and consumables; Ultrasonic controller are guaranteed for 3 months, Welding head and transducer are not warranted);
2. Receiving disorder of equipment, the supplier and the buyer shall negotiate to solve the problem.
3. After the expiration of the warranty period, the supplier shall charge labor and transportation fees for the maintenance of the equipment. In case of replacement or purchase of accessories related to the equipment, the supplier shall only charge costs.
http://www.gdqintech.com/